Product Details:
Payment & Shipping Terms:
|
Surface: | Hot Dip Galvanized | Zinc: | 80-100um |
---|---|---|---|
Peneration Rate: | Over 95% | Material: | Steel Sheet |
Silicon: | Less Than 2% | Application: | Electricity Transmission |
Service Life: | Over 30 Years | ||
Highlight: | galvanized steel post,galvanized metal pipe |
Hot dip Galvanized Overhead Line Substation Structure Electric Steel Pole
Description:
Applied to the material of general-purpose steel GB/T1591-2008, Q235, Q345, Q420, Q460 used in China.
China-GB | America-ASTM | Equivalent |
Q235 | Grade D | SS400,S235JO |
Q345 | Grade50[345] | S355JR |
Q420 | Grade60[415] | S420NL |
Q460 | Grade65[450] | S460NL |
Type | Substation Structure Frame |
Suit for | Electricity Network |
Shape | polygonal |
Material | Steel |
Tolerance of dimension | +- 2% |
Power | 10 KV ~550 KV |
Safety Factor | Safety factor for conducting wine: 8 |
Design Load in Kg | 300~ 1000 Kg applied to 50cm from the top pole |
Marks | Name plate through rivet or glue, engrave, emboss as per customer requirement |
Surface treatment |
Hot dip galvanized with ASTM A 123, color as client required. |
Joint of Poles |
Insert mode, inner flange mode, face to face joint mode |
Design of pole | Against earthquake of 8 grade |
Wind Speed | 160 Km/Hour . 30 m /s |
Minimum yield strength | 355 mpa |
Minimum ultimate tensile strength | 490 mpa |
Max ultimate tensile strength | 620 mpa |
Standard | ISO 9001 |
Length of per section | Within 14m once forming without slip joint |
Welding | Welding Standard: AWS ( American Welding Society ) D 1.1 |
Thickness | 2.5 mm to 30 mm |
Manufacturing Process
We buy the raw material from famous mill factory here in China. We'll check the elements of the raw material like silicon, carbon, sulfur etc. in our lab test room. If they are unqualified, we'll return them. In this way, we can control the quality from the first beginning.
Our factory owns advanced production lines and machines including bending calibration machine, hydraulic plate shears machine, shears machine, slitting machine, 208T hydraulic straightener, etc. All insure us to produce steel poles with the best quality.
After the fabrication process as cutting plate, bending, forming, automatic welding, drilling holes, we get poles checked before galvanized, hot dip galvanized and powder coating and finally we get poles checked according to client's requirements.
To ensure the quality, we have professional technicians to check the pole during the manufacturing and before delivery.
We use sack to pack the poles at the pole top and bottom, which is our normal package. We also use wood between the poles but it costs just a bit more than normal package. We normally use 40HQ containers and our Port limit weight for a 40HQ is 26 tons.
→Raw material test (We buy the raw materials from famous mill factory here in China. We'll check the elements of the raw material like silicon, carbon, sulfur etc. in our lab test room. If they are unqualified, we'll return them. In this way, we can control the quality from the first beginning.)
→ Cutting →Bending (imported 1600Tons Hydraulic Bending Machine)→Welding (longitudinal penetration rate over 95%)→Dimension verify →Flange welding →Hole drilling →sample assemble → surface clean→ Galvanization or powder coating, painting →Recalibration →Packages
FAQ
1. Are you a manufacturer or a trading company?
A: We are the direct factory manufacturer and the trading company.
2. Where is your company located?
A: Our factory is located in Industrial Zone, Heqiao Town, Yixing District, Wuxi City, Jiangsu Province, China(mainland).
3. What are your main products?
A: Our main products are electric poles, street lighting poles, high mast pole, telecommunication tower poles, traffic signal poles, wind generation poles, etc.
4. What's your nearest port?
A: Shanghai Port is our nearest port. It's only 30 minutes' driving from our factory to Shanghai Port.
5. What's your payment term?
A: Normally 30% deposit and rest by TT before shipping. Or L/C.
6. What's your delivery time?
A: Normally within 15 working days. If our factory is busy and your quantity is large, then around one month.
Contact Person: Mrs. Lisa Li
Tel: +8613601538657
Fax: 86-510-80321126