Product Details:
Payment & Shipping Terms:
|
Shape: | Dodecagonal | Type: | Burial Type |
---|---|---|---|
Material: | Q460 | Height: | 105FT |
Thickness: | ≥6mm | Application: | 69KV Line |
Galvanization Thickness: | Min Average Coating 100 Microns | ||
Highlight: | Dodecagonal Power Transmission Steel Pole,105FT Transmission Steel Pole,Q460 Electrical Power Pole |
We can design products as customers' demand or manufacture for you if you have pictures or drawing.
Also, if you want to consult the price, please provide the drawings so that we can tell you the price quickly and accurately.
A Quality, loyalty and service is our faith!
B Deemed continuous improvement as our permanent pursuits.
C We will do our best to deal with the problems our customers encountered, in order to ensure our customers' satisfaction and also improve our better reputation.
Height | 105FT |
Type | Direct Burial |
Shape | Dodecagonal |
Material |
Hot Roll Steel Q235, Q345, Q420, Q460, ASTM A527 A36, GR50, GR65, and others equivalent steel material |
Thickness |
≥6.0mm |
Welding | Welding complies with AWS D1.1 standard. CO2 welding or submerged arc auto methods No fissure, scar, overlap, layer or other defects Internal and external welding makes the pole more beautiful in shape If customers need any other requirements of welding, we also can make adjustment ad your request. |
Standard | NEA |
Surface Treatment | Hot dip galvanization in accordance with Chinese standard GB/T 13912-2002 or American standard ASTM A123 or AS/NZS 4680:2006 Can be powder coated or painted according to clients' request. |
Fabrication process | Cutting plate, bending ,forming, automatic welding, drilling holes ,quality check before galvanized, hot dip galvanized, final quality check according to client's requirement. |
Applied to the material of general-purpose steel GB/T1591-2008, Q235, Q345, Q420, Q460 used in China.
Production Process
Because of there is nearly no any accessories on the poles shaft, so most of the clients agree with delivery the 25ft -40ft steel poles without package which is can save the space of the container, and also can save the purchasing cost. Of course ,if our clients have request or standard for the package of the steel poles, we are also glad to packing the steel poles according to client's request.
Packaging | |
Packaging Details |
1. No packing, just bare poles to be delivered directly. This is the most economic way.
2. Sack wrap. 3. Non-woven fabrics wrap. Also can following by client required
|
Delivery | |
Time | It depends on your quantity. Normally within 30 working days |
Delivery Details | 1. We normally use 40ft container and our Port limit weight for 40ft container is 26Tons. 2. If poles are with flange or in order to avoid scratch on poles during delivery, we will use 40ft open top container, which is a bit more costive than the 40ft container. |
Jiangsu Baojuhe Science and Technology Co.,Ltd (the old name Jiangsu Bosheng Steel Poles Co.,Ltd) is located in Heqiao Town Industrial Zone, Yixing District, Wuxi City, Jiangsu Province, China.
The company covers an area of 50000 square meters, and the registered capital is 60080000 RMB. With 100 staff working together, the annual capacity of our factory is more than 30000 tons of steel poles and steel tube components. Moreover, our factory has the professional engineer team, experienced overseas department and domestic marketing department. Advanced test equipment, high-quality producing machines and sophisticated technology ensures us to provide the best products and services to meet customers' different requirements.
Through the efforts of the company staff, the support and cooperation from clients all over the world, our company's products have been exported to Philippines, Australia, America, Africa, Latin America, Jordan, Panama, etc. We have good export experience with 2 containers exported overseas in average every day.
'Close cooperation with our clients and persistent innovation for our clients ' is our team principle. 'Quality first, customer focus' is our managing principle. We are looking forward to cooperating with you to create a win-win situation and a bright future.
When the raw material arrives at the warehouse ,the quality department must take testing to make sure the raw material have meet all the standard that the needed before production. Before galvanization, we will check the pole quality during the fabrication process from cutting raw plate, bending/forming, automatic welding to drilling holes. Then after hot dip galvanization, we will check the diameters, galvanization thickness and do the load test according to clients' different requirements and then deliver the poles on time based on the contract.
1. Are you a manufacturer or a trading company?
A:We are the direct factory manufacturer and the trading company.
2. Where is your company located?
A:Our factory is located in Industrial Zone No.37, Heqiao Town, Yixing District, Wuxi City, Jiangsu Province, China(mainland).
3. What are your main products?
A:Our main products are electric poles, street lighting poles, high mast pole, telecommunication tower poles, traffic signal
poles, wind generation poles, etc.
4. What's your nearest port?
A: Shanghai Port.
5. What's your payment term?
A: Normally 30% deposit and rest by TT before shipping. Or L/C.
6. What's your delivery time?
A: It depends on your quantity. Normally within 30 working days.
Our Website:http://www.metalutilitypole.com/
Contact Person: Mrs. Lisa Li
Tel: +8613601538657
Fax: 86-510-80321126