Product Details:
Payment & Shipping Terms:
|
Material: | Steel Q345 | Shape: | Octagonal |
---|---|---|---|
Tolerance: | +-2% | Min Yield Stress: | 345Mpa |
Tensile Strength: | 470 Mpa ~ 630 Mpa | Finishing: | Hot Dip Galvanized Over 86mm |
Galvanized: | ASTM A123 | Welding: | AWS D1.1 |
Length: | 30FT 40FT | ||
Highlight: | 30 ft galvanized pole,octagon shape galvanized pole,electricity transmission line galvanized pole |
30FT 40FT Octagon Shape Galvanized Electric Steel Pole Philippines Electricity Transmission Line
Specifications:
Steel Pole of National Electrification Administration
PHILIPPINES)
Specification for Distribution Steel Pole 25FT, 30FT, 35FT, 40FT,45FT.
Height (ft) |
Thickness (mm) |
Butt Diameter (mm) |
Top Diameter (mm) |
Design Load (kg) |
Yield Stress (MPA) |
Zinc Coating (microns) |
25 | 2.5 | 152 | 120 | 300 | 345 | 86 |
30 | 3.0 | 226 | 127 | 500 | 345 | 86 |
35 | 3.0 | 248 | 127 | 500 | 345 | 86 |
40 | 3.0 | 317 | 127 | 500 | 345 | 86 |
45 | 4.0 | 328 | 127 | 750 | 345 | 86 |
Production Process
Description
JSBS has passed the ISO 9001 quality management system. And we have our own Lab to do the chemical and mechanical test. For example, we test the raw material component content and the strength when we purchase the raw material. And if the material does not pass the test,we’ll not use it to produce our poles. So customers can be rest assured that we always manufacture the good quality poles. Meanwhile, our factory has the AMT ( Advanced Manufacturing Technology ), all the purposes are to provide high-quality poles to all over the world.
We will test the metal sheet thickness, galvanization Thickness and do the load test according to client's request before delivery. This ensures the quality of the steel poles we produce.
Our factory has built special plant for testing the load of steel poles.
Terms and Conditions
1. Price Term: EXW, FOB, CFR or CIF.
Ø EXW: Poles Cost
Ø FOB : Pole Cost + Land Transportation + Fee on Port
Ø CFR : Pole Cost + Land Transportation + Fee on Port + Sea Freight
Ø C I F : Pole Cost + Land Transportation + Fee on Port + Sea Freight + Insurance.
2. MOQ: One 40FT Container.
3. Payment Term: Typically 30% by T/T as a deposit, balance by T/T or L/C at sight before shipment. Other payment way can be negotiated.
4. Delivery Time: 30 working days after PI/drawing/ prepayment confirmed.
5. Package: Normally wrapped by plastic bags or burlap cloth at the top and bottom, or according to clients’ requirement.
Company Introduce:
Contact Person: Mrs. Lisa Li
Tel: +8613601538657
Fax: 86-510-80321126